Skip to content

Lake Lillinonah – Beginning on October 26, 2022 FirstLight will conduct a drawdown of Lake Lillinonah at the Shepaug Dam to conduct its maintenance and inspection activities. The normal summer operating range of the station is from 200’-195.5’ and the drawdown will target an elevation of 191’. The drawdown will lower lake levels to minimum pond levels and return to normal operating elevations on November 7, 2022. All homeowners are encouraged to remove structures, boatlifts, and docks from Lake Lillinonah to prevent ice or flood damage from occurring during the winter months. All work planned to occur along the shoreline requires prior permitting from FirstLight, who can be contacted at lake.permits@firstlightpower.com.

 

Lake Zoar – Beginning on October 15, 2022 FirstLight will conduct a fall drawdown of Lake Zoar at the Stevenson Dam to conduct its maintenance and inspection activities. The normal summer operating range of the station is from 103’-100’ and the drawdown will target an elevation of 98.5’. The drawdown will lower lake levels to minimum pond levels and return to normal operating elevations on October 26, 2022. All homeowners are encouraged to remove structures, boatlifts, and docks from Lake Zoar to prevent ice or flood damage from occurring during the winter months. All work planned to occur along the shoreline requires prior permitting from FirstLight, who can be contacted at lake.permits@firstlightpower.com.

Lake Lillinonah at Shepaug Station

We welcome inquiries from the media, questions about our projects and recreation spaces, and gladly engage curiosity about our mission, vision, and more.

Contact us for media inquires and interview requests.